SIERSZA Power Plant

Trzebinia

Installed boilers:

Boiler Type Qty Capacity [t/h] /Output Power [MW] Steam Temperature [oC] Steam Pressure [MPa] Fuel Start-up Year
OP 4 380 t/h 540/540 13,2/2,7 bituminous coal 1969 - 1970
OFz 2 425 t/h 560 16,0 bituminous coal 2001 - 2002
 

Installed FGD plants:

Boiler Thermal or electric output Flue gas quantity [mn3/h] Sulphur content in fuel in % Desulphurisation efficiency in % Absorbent Final product Start-up Year
K3, K6 (OP-380) 2 x 120 MWel 2 x 538 160 1,5 87 burnt lime ash and desulphurisation products 1998

Installed dust extraction equipment:

Heat or electricity power Boiler number Flue gas flow [m^3/h] Guaranteed emission [mg/m^3] Fuel Start-up Year
120MW K3 500 000 <300 bituminous coal 2012

Installed boiler modernization / NOx reduction:

Boiler Type Boiler number Description Reduction [%] NOx emission [g/GJ] Start-up Year
OP-380 Boiler No 3 Low-emission wall swirl burners Sup: BABCOCK ENERGY Ltd.   150 - 190 1993
OP-380 Boiler No 5 Low-emission wall swirl burners Liecence: BABCOCK ENERGY Ltd.   <200 1994
OP-380   Wall swirl burners, frontal furnace   NOx<165 1998

BACK TO THE MAP OF IMPLEMENTATIONS