References

OBRENOVAC Power Plant

Obrenovac

Installed dust extraction equipment:

Heat or electricity power Boiler number Flue gas flow [m^3/h] Guaranteed emission [mg/m^3] Fuel Start-up Year
350 MW A6 2 x 1 660 000 <45 lignite 2011
675 MW B2 5 587 400 <45 lignite 2011

Installed boilers:

Boiler Type Qty Capacity [t/h] /Output Power [MW] Steam Temperature [oC] Steam Pressure [MPa] Fuel Start-up Year
BB 1 920 t/h 540/540 18,2/4,2 lignite 1966 - 1976

Installed boiler modernization / NOx reduction:

Boiler Type Boiler number Description Reduction [%] NOx emission [g/GJ] Start-up Year
BB-920 A6 Modernization of boiler – new membrane walls of the furnace chamber   NOx< 300 mg/m3 2010
BB-1880   Modernization of boiler (increase of parameters up to 2000 t/h)     2012

BACK TO THE MAP OF IMPLEMENTATIONS