References

BEŁCHATÓW Power Plant

Rogowiec

Installed dust extraction equipment:

Heat or electricity power Boiler number Flue gas flow [m^3/h] Guaranteed emission [mg/m^3] Fuel Start-up Year
370 MW K4 2 050 000 <50 lignite 2009
360 MW K5 i K6 2 x 2 050 000 <50 lignite 2011

Installed boilers:

Boiler Type Qty Capacity [t/h] /Output Power [MW] Steam Temperature [oC] Steam Pressure [MPa] Fuel Start-up Year
BB 12 1150 t/h 540/540 18,3/4,2 lignite 1982 - 1988
BB 1 2400 t/h 554/582 26,6/5,4 lignite 2012

Installed FGD plants:

Boiler Thermal or electric output Flue gas quantity [mn3/h] Sulphur content in fuel in % Desulphurisation efficiency in % Absorbent Final product Start-up Year
K5, K6 2 x 360 MWel 2 x 2 100 000 0,75 max 1,2 93 limestone gypsum 2000
K7, K9 2 x 360 MWel 2 x 2 100 000 0,75 max 1,2 95 limestone gypsum 2003
K3, K4 2 x 360 MWel 2 x 2 100 000 0,6 max 1,85 95 limestone gypsum 2007
K8, K10, K11, K12 4 x 370 MWel 2 x 2 100 000 1,2 max 1,85 95 limestone gypsum 2011
BB-2400 858 MWel 2 x 1 800 000 1,2 max 1,85 96 limestone powder gypsum 2011
K1, K2 2 x 360 MWel 2 400 000 1,2 max 1,85 96 limestone gypsum 2012

2007 - Expansion of the gypsum storage site

2014 - Modernisation of the flue gas desulphurisation plants for Units No. 5 and 6

2016 - Modernisation and overhaul of the flue gas heating system for Units No. 8, 10, 11 and 12


BACK TO THE MAP OF IMPLEMENTATIONS