References

JAWORZNO Power Plant 910 MWe. Supercritical Boiler BP-2450. Bituminous coal. Plan 2020.

Oprac. J. Rydzak
Jaworzno

Installed dust extraction equipment:

Heat or electricity power Boiler number Flue gas flow [m^3/h] Guaranteed emission [mg/m^3] Fuel Start-up Year
50 MW OFz-201 266 050 <20 bituminous coal 2012
910 MW Block 910 MW 2 417 686 <30 bituminous coal 2017
 

Installed boilers:

Boiler Type Qty Capacity [t/h] /Output Power [MW] Steam Temperature [oC] Steam Pressure [MPa] Fuel Start-up Year
OP 6 650 t/h 540/540 13,6/2,2 bituminous coal 1977 - 1978
OFz 1 201 t/h 510 9,7 biomass - woodchips + pellet 2012
BP 1 2362 600/610 27.5/5.8 bituminous coal plan 2019
 

Installed FGD plants:

Boiler Thermal or electric output Flue gas quantity [mn3/h] Sulphur content in fuel in % Desulphurisation efficiency in % Absorbent Final product Start-up Year
K1,2,5,6 (OP-650) 4 x 200 MWel 2 x 1 850 000 1,5 95 limestone powder ash and desulphurisation products 1996
K3,4 (OP-650) 2 x 200 MWel 1 850 000 śr. 1,2 95,6 limestone powder gypsum 2008

Installed SCR:

Boiler Type Description NOx emission Start-up Year
BP- 2450 SCR installation NOx< 150 (85) mg/m3n 2019

Installed boiler modernization / NOx reduction:

Boiler Type Boiler number Description Reduction [%] NOx emission [g/GJ] Start-up Year
OP-650 Kocioł Nr 4 Low NOx wall swirl burners + OFA system Licence: ECO-ENERGIA   <170-230 1994

Complete Power Generation Units:

Moc bloku Opis Sprawność Rok uruchomienia
910 MW Supercritical steam coal  45,91% netto plan 2019
 

BACK TO THE MAP OF IMPLEMENTATIONS