OFFER
References
SIERSZA Power Plant
Trzebinia
Installed dust extraction equipment:
Heat or electricity power | Boiler number | Flue gas flow [m^3/h] | Guaranteed emission [mg/m^3] | Fuel | Start-up Year |
---|---|---|---|---|---|
120MW | K3 | 500 000 | <300 | bituminous coal | 2012 |
Installed boilers:
Boiler Type | Qty | Capacity [t/h] /Output Power [MW] | Steam Temperature [oC] | Steam Pressure [MPa] | Fuel | Start-up Year |
---|---|---|---|---|---|---|
OP | 4 | 380 t/h | 540/540 | 13,2/2,7 | bituminous coal | 1969 - 1970 |
OFz | 2 | 425 t/h | 560 | 16,0 | bituminous coal | 2001 - 2002 |
Installed FGD plants:
Boiler | Thermal or electric output | Flue gas quantity [mn3/h] | Sulphur content in fuel in % | Desulphurisation efficiency in % | Absorbent | Final product | Start-up Year |
---|---|---|---|---|---|---|---|
K3, K6 (OP-380) | 2 x 120 MWel | 2 x 538 160 | 1,5 | 87 | burnt lime | ash and desulphurisation products | 1998 |
Installed boiler modernization / NOx reduction:
Boiler Type | Boiler number | Description | Reduction [%] | NOx emission [g/GJ] | Start-up Year |
---|---|---|---|---|---|
OP-380 | Boiler No 3 | Low-emission wall swirl burners Sup: BABCOCK ENERGY Ltd. | 150 - 190 | 1993 | |
OP-380 | Boiler No 5 | Low-emission wall swirl burners Liecence: BABCOCK ENERGY Ltd. | <200 | 1994 | |
OP-380 | Wall swirl burners, frontal furnace | NOx<165 | 1998 |