References

SIEKIERKI CHP Plant

Warszawa

             
             
             
             
             
             
             

 


 


 

           
           

Installed dust extraction equipment:

Heat or electricity power Boiler number Flue gas flow [m^3/h] Guaranteed emission [mg/m^3] Fuel Start-up Year
105 MW K1 304 000 <50 bituminous coal 2009

Installed boilers:

Boiler Type Qty Capacity [t/h] /Output Power [MW] Steam Temperature [oC] Steam Pressure [MPa] Fuel Start-up Year
OP 4 230 t/h 540 11,0 bituminous coal 1962
WP 3 140 MW 155 3,0 bituminous coal 1971
OP 3 430 t/h 540 16,2 bituminous coal 1974 - 1978
OP 1 380 t/h 540/540 15,5/2,6 bituminous coal 1975
WP 1 233 MW 160 1,6 bituminous coal 1982
OP 2 230 t/h 540 10,0 bituminous coal 1997 - 2002
 

Installed FGD plants:

Thermal or electric output Flue gas quantity [mn3/h] Sulphur content in fuel in % Desulphurisation efficiency in % Absorbent Final product Start-up Year
1 861 MWt 2x 1 550 000 1 max 1,2 93 limestone powder gypsum 2012

Installed boiler modernization / NOx reduction:

Boiler Type Boiler number Description Reduction [%] NOx emission [g/GJ] Start-up Year
OP-430 Kocioł Nr 14 Tangential furnace, conventional burners, OFA and SOFA nozzle system 50 <150 1995/96

BACK TO THE MAP OF IMPLEMENTATIONS